Leave Your Message
Municipal WWTP Winter Crisis: 5 Science-Backed Strategies for Stable Operation

News

News Categories
Featured News

Municipal WWTP Winter Crisis: 5 Science-Backed Strategies for Stable Operation

2025-05-20

The Silent Threat: How 5°C Wrecks Urban WWTPs

Northern municipal plants face winter emergencies:

  • Ammonia spikes exceeding 8 mg/L

  • 40% longer dewatering cycles

  • $12K/day penalties for TP violations

JUNTAI's 5-pillar solution combines biofilm engineering and waste heat recovery:

wwtps winter


 

Pillar 1: Biofilm-Hybrid Reactors

  • Design: 70% suspended biomass + 30% carrier-bound nitrifiers

  • Performance:

    • 82% NH3-N removal at 8°C (vs 48% in conventional AAO)

    • 60% less sludge bulking


Pillar 2: Thermal Energy Harvesting

Source Recovery Rate Temp Boost
Digester Gas 85% +4°C
Treated Effluent 65% +2°C
Combined Effect - +5°C

Case: Beijing suburb plant achieved:
✅ 11°C bioreactor temp without external heating
✅ 28% energy cost reduction


Pillar 3: Dynamic SRT Control

  • Winter Protocol:

    • MLSS: 6,500 → 8,200 mg/L

    • SRT: 15 → 22 days

    • DO: 2.5 → 3.8 mg/L

  • Results:

    • Nitrifier population increased 3.2x

    • Filamentous bacteria suppressed by 70%


Metric Baseline JUNTAI System
NH3-N at 6°C (mg/L) 8.2 2.1 (-74%)
Dewatering Time (h) 9.5 5.2 (-45%)
O&M Cost ($/ML) 420 310 (-26%)